Tiny House Project – Trailer Floor Build.

On April 7th another huge step took place on our Tiny House build.  We moved the trailer from our trailer manufacturer HMJ Trailers in Morayfield across Brisbane to the Tiny House Company. Greg at the Tiny House company had very generously offered space in his warehouse for the day to build the floor onto the Tiny House.

Attaching the floor to the trailer.

With Matthew our projects lead builder, apprentice Ryan, and Susan and Mark all present we set about attaching the floor to the trailer. Our partners James Hardie,  and Platinum Timber and Hardware generously donated the materials for this stage of the build.

It wasn’t long before Mark found out that the screwing down of the materials on top of the trailer was a little bit more difficult than it looked. Matthew and Ryan set about making the cuts of the materials, glueing and screwing down the sheets and after just over three houses the job was done.

Our 7.5m long by 2.4 meter wide Tiny House Trailer now has its floor down.

 

 

 

 

 

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *